Developer - Intuitive Machines, Inc.
Intuitive Machines Nova-C on Wikipedia
Developer - Intuitive Machines, Inc.
Intuitive Machines Nova-C on Wikipedia
Last edited by Airicist2; 16th February 2024 at 02:14.
Article "Odysseus, a Private Lunar Lander, Launches Toward the Moon"
A SpaceX rocket lifted the spacecraft, which was built by Intuitive Machines of Houston to carry cargo for NASA and other customers to the lunar surface.
by Kenneth Chang
February 14, 2024
Odysseus Nova-C IM-1 launch and Falcon 9 first stage landing
Feb 15, 2024
A SpaceX Falcon 9 rocket launched Intuitive Machines’ Odysseus (Odie) Nova-C lunar lander, the IM-1 mission, to a lunar transfer orbit from Launch Complex 39A (LC-39A) at Kennedy Space Center in Florida, on 15 February 2024, at 06:05 UTC (01:05 EST). Following stage separation, Falcon 9’s first stage landed on Landing Zone 1 (LZ-1) at Cape Canaveral Space Force Station in Florida. Falcon 9’s first stage (B1060) previously supported 17 missions: Transporter-2, GPS-III Space Vehicle 03, Turksat-5A, Intelsat G-33/G-34, Transporter-6 and 12 Starlink missions.
Odysseus Nova-C IM-1 deployment
Feb 15, 2024
Intuitive Machines’ Odysseus (Odie) Nova-C lunar lander was successfully deployed into a lunar transfer orbit approximately 48 minutes after being launched by a SpaceX Falcon 9 rocket from Launch Complex 39A (LC-39A) at Kennedy Space Center in Florida, on 15 February 2024, at 06:05 UTC (01:05 EST). Intuitive Machines’ Odysseus (Odie) Nova-C lunar lander is expected to land on the Moon on 23 February 2024.
Odysseus lunar lander’s first images of the Moon
Feb 22, 2024
Intuitive Machines’ Odysseus (Odie) Nova-C lunar lander, the IM-1 mission, has captured its first images of the Moon on 21 February 2024. Odysseus is currently scheduled to land on the Moon on 23 February 2024, at 22:30 UTC (17:30 EST).
Odysseus status update
Feb 24, 2024
On 23 February 2024, NASA and Intuitive Machines provided an update on the status of the Odysseus lunar lander. Intuitive Machines’ Odysseus (Odie) Nova-C lunar lander, the IM-1 mission, has successfully landed near the Malapert A crater, in the Moon’s South Pole region, on 22 February 2024, at 23:24 UTC (18:24 EST).
Article "Intuitive Machines lands on the moon"
by Jeff Foust
February 22, 2024
Article "A U.S.-Built Spacecraft Lands on the Moon for the First Time Since 1972"
by Kenneth Chang
February 22, 2024
Социальные закладки